Sizing a detention or debris basin from LiDAR: drainage area, stage-storage and the 85th-percentile storm
November 25, 2026

Every basin sizing job comes down to two numbers. One is how much water or debris the tributary area will send in. The other is how much room the basin has at each elevation.
The second number is the stage-storage curve, and it comes straight from the terrain surface. This post shows how to build one from a LiDAR-derived DEM, what design storm to hold it against, and where the arithmetic goes wrong.
The worked example uses a real basin: Bailey Debris Basin in Altadena, Los Angeles County. Public airborne LiDAR from before and after the February 2025 storm lets us compute its curve twice. It is a debris basin, not a water-quality detention pond. But the method for the curve is the same, and the comparison shows what the curve can and cannot tell you.
Three questions, three different "design storms"
"Basin sizing" covers at least three different questions. Each has its own design event.
- Water quality volume. In Los Angeles County this is the stormwater quality design volume (SWQDv). The County's LID manual defines the design storm as the greater of the 0.75-inch, 24-hour event or the 85th percentile, 24-hour event%20Manual.pdf) read off the County's isohyetal map.
- Peak-flow or flood detention. This is held against a frequency storm such as the 10-, 25- or 50-year event. NOAA Atlas 14 gives those depths by location.
- Debris capacity. In the County's sedimentation manual the basin is sized to a Design Debris Event: debris production per square mile times the tributary area. Its Appendix D example multiplies 37,500 cubic yards per square mile by 0.2 square miles to get 7,500 cubic yards.
Mixing these up is the most common error in a scoping conversation. The 85th percentile storm is a small, frequent event. The County's 2004 analysis says depths range from 0.30 to 1.50 inches across the county. A 50-year storm at the same place can be ten times that.
Step 1: the tributary area
Runoff volume starts with the area draining to the basin. A LiDAR bare-earth DEM lets you trace flow direction cell by cell and delineate that area from the surface rather than from a hand-drawn line.
Two cautions apply.
- In a developed area, drainage follows pipes, curbs and walls as well as ground. A DEM-only delineation misses storm drains. Field-check the divides that matter.
- For a published basin you may not need to delineate at all. The County's Hydrologic Report 2020-2021 lists the uncontrolled drainage area above each debris basin. For Bailey it is 0.60 square miles, or 384 acres.
The Bailey DEM extract used here is a 500 m window around the basin. It cannot delineate a 384-acre watershed, so the example takes the published area.
Time of concentration also comes from the terrain. The County's LID manual uses a regression equation for it, and its worked example%20Manual.pdf) lists flow path length (680 ft) and average slope (4.4%) as inputs. Both are measurements a surface can supply.
Step 2: the design storm for the location
Two lookups cover most of the rainfall side.
NOAA Atlas 14. The Precipitation Frequency Data Server returns depth by duration and return period for any point. For Bailey (34.1723, -118.0615) the partial-duration 24-hour depths are:
| Return period | 24-hour depth (in) |
|---|---|
| 1-year | 3.38 |
| 2-year | 4.51 |
| 5-year | 6.08 |
| 10-year | 7.44 |
| 25-year | 9.39 |
| 50-year | 11.0 |
| 100-year | 12.7 |
The 85th percentile storm. This is not an Atlas 14 product. The County published it as a GIS isohyet layer. Querying that layer within 4 km of Bailey returns two contour lines, 1.0 and 1.1 inches. The basin sits between them, about 1.8 km from the 1.1 line and 3.7 km from the 1.0 line. This post uses "about 1.1 inches."
A useful unit to keep in your head: one inch of runoff over one acre is 3,630 cubic feet, or about 134 cubic yards. So 1.1 inches over a 5-acre site is 19,965 cubic feet if every drop ran off.
The County's own worked example shows how far that is from the answer. A 5-acre commercial site that is 95% impervious, with an 85th percentile depth of 1.1 inches, gets an SWQDv of 0.39 acre-feet, or 17,000 cubic feet%20Manual.pdf). That is about 85% of the rainfall volume. The County computes it with MODRAT or its HydroCalc program, which is limited to project areas of 40 acres or less. The simple depth-times-area product is a check, not the submittal.
The same manual requires Priority Development Projects to retain the SWQDv on site. So for water quality in Los Angeles County, the volume you size is often a retention volume, not a detention one. Read your own jurisdiction's manual.
Step 3: the stage-storage curve from the DEM
Now the part LiDAR does directly. A stage-storage curve answers: if water or debris stood at elevation h, how much volume sits below it?
The County's sedimentation manual describes the hand method. Measure the area behind the dam at each contour, average the areas of two contours, multiply by the interval, and sum from the basin floor up. Its maximum interval is 2 ft for small basins and 5 ft for basins of 50,000 cubic yards or more. The total to the spillway crest is the "Level Capacity."
A DEM does the same thing at every cell instead of every contour. For each elevation h:
- Find the cells lower than h that connect to the basin floor. Disconnected low spots elsewhere do not count.
- Sum (h minus ground elevation) times cell area over those cells.
- Repeat in small steps, 0.5 ft here, and plot elevation against volume.
Figure 1 shows the connected area below Bailey's published spillway crest elevation of 1,155 ft on the 2023 surface.

Figure 2 runs the same calculation on two surfaces: the 2023 USGS 3DEP DEM, and the NCALM/OpenTopography airborne survey flown Feb. 20-21, 2025, after the storm.

| Surface | Storage below 1,155 ft (cu yd) |
|---|---|
| 2023 (USGS 3DEP) | 54,937 |
| Feb. 20-21, 2025 (NCALM) | 10,756 |
| Difference | 44,181 |
The difference is the level-pool storage lost between the two flights, which are almost two years apart. Caltech researchers measured the same basin by differencing surfaces and reported 34,815 cubic meters deposited. That is about 45,500 cubic yards. Their baseline was airborne lidar from Jan. 20-21, 2025, so their number isolates the February storm.
The two figures differ by roughly 3%. They are not the same quantity: one is a volume at a fixed elevation over a longer window, the other a surface difference for one storm. Treat the agreement as a sanity check, not a validation.
Where the curve does not match the published number
The Hydrologic Report lists Bailey's maximum debris capacity as 129,000 cubic yards. The 2023 level-pool volume at the spillway crest is 54,937. Those do not match, and the reason is the definition.
The sedimentation manual's capacity is the Level Capacity plus a "cone capacity." The cone is the wedge of debris that stacks up behind the spillway crest on a gentle slope. For its example the manual sets that slope at half the natural channel slope. The level-pool curve stops at the crest and ignores the cone.
If the gap is the cone, it would be about 74,000 cubic yards. That is an inference from two numbers, not a measured cone. The cone was not reproduced here, because it needs the pre-dam ground below the spillway, which a recent DEM does not show. One supporting clue: Chen and colleagues list Bailey's design capacity as 98,457 cubic meters, about 128,800 cubic yards, which matches the County's 129,000.
Three other things can also separate a DEM curve from a published capacity:
- Datum. The report gives elevations in feet "AMSL" and does not name a vertical datum. The DEMs are in NAVD88. At Bailey, NOAA's NCAT tool&outDatum=NAD83(1986)&inVertDatum=NGVD29&outVertDatum=NAVD88&orthoHt=352.044&orthoHtUnits=m) puts NAVD88 0.811 m (2.66 ft) above NGVD29. If 1,155 ft is an NGVD29 value, the crest is 1,157.66 ft NAVD88, and the 2023 volume rises from 54,937 to 65,117 cubic yards, a 19% change. On both DEMs the pool first spills out of the basin at about 1,157.7 ft NAVD88, which fits that reading. That is an inference, not a confirmed datum. Always get the datum in writing.
- Surface condition. A DEM measures the basin as it is on flight day, with whatever sediment, vegetation or water is there. A curve from a surface with sediment on the floor is the room you have now, not the room you designed.
- Ponded water. Right after a storm, a lidar sensor reads the water surface. Chen and colleagues found that estimates made right after the storm overstated deposition by about 15%.
None of this makes the DEM curve wrong. It answers a clear question: how much room is there below this elevation, today?
Step 4: put storage next to the design storm
The last step compares the room with what arrives. For a flood or water quality basin, you convert storage to an equivalent depth over the tributary area, then compare it with the design depth.
For Bailey, 54,937 cubic yards is 1.48 million cubic feet. Spread over 384 acres that is a depth of 1.06 inches. The February 2025 surface holds 0.21 inches.

Read this chart with care. It assumes every inch of rain becomes runoff. Real runoff depends on soil, cover and burn condition. A burned watershed sends water and debris together, so bulking raises the volume further. And a debris basin is sized to debris production, not to rainfall depth.
What the chart does show is scale. The frequent-storm depth is a small fraction of the large events, and a basin that holds about one inch of runoff is small next to even the 1-year depth of 3.38 inches, if the whole tributary area is contributing. For a detention pond on a development site, this is the same comparison with the outlet structure added: storage at each stage, and how fast the outlet drains it.
What the survey has to deliver
The curve is only as good as the surface under it. For design or a permit submittal, ask for the following.
- A ground-classified DEM, with the grid size stated. A surface that includes vegetation or equipment overstates elevation and understates storage.
- The vertical datum and geoid model, and a conversion note if the design drawings use another datum.
- An accuracy statement from checkpoints. ASPRS Edition 2 calls for at least 30 checkpoints and reports vertical accuracy as RMSEv.
- Flight and conditions. Date, water in the basin, and ground cover.
- The cell size and method behind the volume, and the elevation you are measuring to.
Sensor claims are a starting point, not a result. DJI specifies the Zenmuse L2 at 4 cm vertical and 5 cm horizontal at 150 m, measured in a DJI lab environment. An independent test by Tamimi and Toth found about 7 cm RMSE over open road and 21 cm under dense canopy. Basin floors are usually open ground. Inlet channels are often not.
Here is how much those errors can matter at Bailey's scale. A systematic vertical offset of 5 cm over the 9,227 m² footprint is 461 cubic meters, about 600 cubic yards, or 1.1% of the 2023 volume. At 21 cm it is about 2,500 cubic yards, or 4.6%. Random error averages down across many cells, while a bias does not. This is ceiling arithmetic and not an expected error. Checkpoints are how you find out which one you have.
Two other points matter for public agencies.
- Who signs. Topography and volumes delivered for design or a permit need a licensee in responsible charge. In California that is a PLS, or a civil engineer legally authorized to practice land surveying (BPELSG Bulletin 50). Twinn does not stamp. See the compliance page for how that handoff works.
- Funding. If federal money touches the project, check SAM.gov for current rules on which drones and sensors can be used before you choose a platform.
Why this matters for the people doing the work
Public works crews are stretched. Calimesa's public works director said, "we do not have the staff to have our eyes on every corner of the city and get to everything as soon as it happens" (Marty, Calimesa public works director).
A stormwater program manager in Port Orchard, Washington, described an on-foot inspection that took "four hours plus", against a drone flight that "took that time down to nine minutes" (Zach Holt, Port Orchard stormwater program manager). That is an agency flying its own drone for inspection, which is a different job from an accuracy-checked surface.
For debris basins the language is about cubic yards and getting "back to empty." Santa Barbara County described one basin as taking "approximately 1500 truckloads or 15 000 cubic yards of materials" to get there. A stage-storage curve turns a survey into a number a district can act on: how many cubic yards of room are left at the spillway, and how many trucks that is.
A practical next step
Pick one basin and write down four things: its published spillway elevation, the datum of that elevation, the capacity definition in your design documents, and the date of the last surface you trust. If any of the four is missing, that is your scoping question for the next survey.
If you maintain debris basins and want a stage-storage curve and remaining capacity from a fresh surface, see how Twinn supports debris basin work. Flights are planned with software agents and flown by a human Part 107 pilot, with a licensed partner handling any stamped deliverable.