
Mining, quarries and aggregates · Sample report
Settle the stockpile number before Dec 31.
Fly date before Dec 31? Tell us the site and pile count.
“we justified the cost of this drone ... because we had a project where we did literally a 300 000 ton stockpile and with what our scale said and what ... the product loadout from the client was there was enough discrepancy”
“i need to know a pile number today well it's a 25 mile an hour a win[d] in north dakota too bad”
These operators aren't in our service area, but they describe the problem well.
Illustrative image
01The problem
Scales and loadout disagree. Pile counts are needed today. Year-end inventory goes to the CPA, lender or insurer, and the state regulator says annual reports run late and reclamation cost estimates run low.
02What you get
- 01A pre-Dec 31 stockpile estimate. Send pile outlines (or let us auto-detect them), your material list and your tons-per-CY densities.
- 02You get a per-pile table of material, cubic yards and tons.
- 03The stockpile inventory tool, for a quick measured number on a modelled 3D sample yard.
03How close the tool gets
On the test site, per-pile volumes came within 0.1% of the known answer and the total within 0.01%, with a stated 95% bound of about 0.7%.
Checked on test sites where the true answer was known. Not a promise for your site.
04When you need more
The year-end stockpile inventory statement dated Dec 31, with method, accuracy notes and a sign-off block, repeated quarterly if you like. Optional reclamation progress and slope checks.
- Tons depend on the densities you supply. We don't measure density or moisture.
- Auto-detect expects a flat pad and separated piles. Touching piles, walls or berms need hand-drawn outlines.
- A year-end statement for an auditor or lender is signed off by a licensed PLS/PE partner. The sample sign-off block is blank on purpose.
Get it
The Year-End Stockpile Inventory Statement
Tell us where to send it. The link opens on the next page and arrives by email too. Ask for the free check at the same time and we'll reply to scope it.
Sample site (synthetic data). Fictitious site and coordinates.
Checked on test sites where the true answer was known. Not a promise for your site.
Prepared by Twinn Digital, for review and seal by a licensed PLS/PE where required.
Federal or other restricted project requirements? Compliant LiDAR is available on request. Tell us how the project is funded.