FAA Part 107 CertifiedDrone Photography · Video · Photogrammetry$2M Liability InsuredCalifornia · Metro Atlanta · South FloridaNDAA-Compliant LiDAR on Request for Federal WorkProject-Specific Capture & QA ScopeAI-Planned Flights · Pilot in Command

FAA Remote Pilot study lesson · Reviewed 2026-10-15

Airspace authorization and LAANC

Read the airspace class, check restrictions, and distinguish controlled-airspace authorization from a Part 107 waiver.

Independent study aid. Rules and FAA procedures can change; use the current official sources linked below before a real operation.

By the end of this lesson

  • Classify the airspace at the aircraft's planned location and altitude.
  • Explain when prior ATC authorization is required and how LAANC fits.
  • Separate airspace approval from waivers and temporary restrictions.

Lesson 01

Start with where and how high

Airspace is three-dimensional. A map pin alone does not answer the question: determine the exact site, planned altitude, nearby boundaries, and the vertical limits of each airspace layer. Part 107 generally requires prior ATC authorization for operations in Class B, C, and D airspace and within the lateral boundaries of the surface area of Class E designated for an airport. Other airspace may not need that particular authorization, but restrictions, TFRs, national security areas, and local operational hazards can still apply.

Class B, C, and D areas commonly relate to towered airports, but visual appearance or tower status alone is not a reliable classification. Class E can extend to the surface at certain airports; on a sectional chart, the magenta dashed boundary is a key clue. Class G is uncontrolled airspace, but 'uncontrolled' does not mean risk-free or unrestricted. Use the current sectional, chart supplement when needed, FAA UAS Facility Map, NOTAMs, and official authorization tools together.

Lesson 02

LAANC is a path to authorization

Low Altitude Authorization and Notification Capability (LAANC) automates qualifying requests in participating areas. UAS Facility Map grid values show altitudes at which authorization may be available through LAANC; they are not automatic permission to fly at that altitude. A request is not an approval. Wait for the actual approval and review its geographic footprint, maximum altitude, effective time, and any conditions before launch. In some circumstances, a further coordination request can be submitted, but approval is not guaranteed.

Where LAANC is unavailable or a request does not fit its automated parameters, use the FAA's current DroneZone process or other FAA-published route for airspace authorization. Processing times and procedures can vary, so plan ahead. The authorization is tied to the specified operation; moving a few blocks or changing altitude can cross into another grid or airspace volume. Confirm location precision, datum, altitude reference, and time zone when translating a work order into a request.

Lesson 03

Authorization does not settle every question

An airspace authorization is different from a waiver. Authorization permits a specified flight in controlled airspace; a waiver grants relief from a listed Part 107 provision subject to its conditions. You may need both for one mission, and neither necessarily covers the other issue. A waiver cannot replace a separate airspace authorization when one is required. A property owner's consent likewise does not grant access to controlled airspace or override a federal restriction.

Check NOTAMs and temporary flight restrictions close to the operation because status can change after a request is approved. Review special-use airspace and security-sensitive sites carefully, and follow current FAA guidance where boundaries overlap. Preserve the approval and brief the crew on abort conditions if the aircraft approaches a limit. If electronic tools conflict or the operating area is ambiguous, stop and resolve the discrepancy with authoritative FAA information before takeoff.

Apply the lesson

A grid value is not the approval

Situation: A construction site lies under a Class D shelf. The FAA UAS Facility Map shows 100 feet for the grid, and a pilot plans to launch after submitting a LAANC request.

Reason it through: The grid value tells the pilot what may be available for automated authorization; it does not authorize the flight by itself. The pilot must receive and inspect the approval, confirm its location, altitude, and time conditions, then check for current restrictions and assess the operation. If approval is denied or pending, no launch in the controlled airspace.

Common mistakes to avoid

  • Treating facility-map grid numbers as automatic authorization.
  • Assuming a tower closure turns Class D airspace into Class G.
  • Using a Part 107 waiver, landowner permission, or recreational app notification as an airspace authorization.

Self-check

1. Which broad airspace classes generally require prior ATC authorization under Part 107?

Class B, C, D, and the lateral boundaries of airport-surface Class E areas.

2. What should be checked on the actual LAANC approval?

Its footprint, altitude, effective time, and operating conditions.

Official references

Use the current regulation or FAA/PSI publication when a study summary and official material differ. PSI's current content allocation supersedes the older percentages printed in the ACS appendix.

Reviewed 2026-10-15. This lesson is educational and is not legal advice, FAA approval, or a substitute for current regulations, aircraft instructions, or required training.

Take the practice test