FAA Part 107 CertifiedDrone Photography · Video · Photogrammetry$2M Liability InsuredCalifornia · Metro Atlanta · South FloridaNDAA-Compliant LiDAR on Request for Federal WorkProject-Specific Capture & QA ScopeAI-Planned Flights · Pilot in Command

FAA Remote Pilot study lesson · Reviewed 2026-10-15

Part 107 operating rules

A practical guide to remote pilot responsibility, visual line of sight, speed, altitude, weather minimums, and waivers.

Independent study aid. Rules and FAA procedures can change; use the current official sources linked below before a real operation.

By the end of this lesson

  • Apply the RPIC's authority and responsibility to a crewed operation.
  • Recall the standard operating limits and recognize when an exception is required.
  • Separate authorization, waiver, and operational risk decisions.

Lesson 01

The RPIC is the decision-maker

Part 107 places responsibility for the operation on the remote pilot in command. The RPIC must be designated before flight, ensure the aircraft is in a condition for safe operation, and assess hazards to people and property. A visual observer, payload operator, client, or autopilot can contribute information; none silently takes over the RPIC's legal role. If more than one pilot is involved, agree who is RPIC and how control and communications will work before launch.

The RPIC may allow a person to manipulate controls only when the regulatory supervision conditions are met. That includes the pilot being able to take direct control immediately and the operation remaining within the applicable rules. Automation does not make a prohibited route legal or remove the duty to monitor. A sound briefing identifies control transfer phrases, lost-link response, abort criteria, and who watches the airspace.

Lesson 02

Standard limits are operating boundaries

For a standard small UAS operation, Part 107 generally limits groundspeed to 87 knots (100 mph), altitude to 400 feet AGL, and flight to daylight, civil twilight with appropriate anti-collision lighting, or night under the night-training and lighting rules. Minimum visibility is three statute miles from the control station, and cloud clearance is at least 500 feet below and 2,000 feet horizontally. The regulation contains specific exceptions and definitions; apply the precise rule to the facts rather than remembering only a headline number.

The 400-foot rule has an important structure: the aircraft is generally kept at or below 400 feet AGL, with a provision allowing flight higher than that when the aircraft is within a 400-foot radius of a structure and no more than 400 feet above its immediate uppermost limit. That does not erase airspace ceilings or other restrictions. Speed, visibility, cloud separation, right-of-way, and people-overflight rules continue to apply even if the aircraft is low and close to a structure.

Lesson 03

Authorization and waiver answer different questions

A controlled-airspace authorization answers whether the aircraft may operate in specified controlled airspace, at a defined location, altitude, and time. A Part 107 waiver addresses a specific regulatory provision the FAA has authorized the operator to vary. Neither document is a general license to ignore other rules, and neither automatically approves a different site, date, aircraft, or operating plan. Read the conditions and keep the authorization accessible to the crew.

The RPIC must still decide whether the actual conditions are safe. A mission can be technically within a limit and still be a poor choice because gusts, glare, RF interference, nearby people, or an unreliable command link leave no safe margin. Treat each rule as a floor for compliance, then add operating margins appropriate to aircraft performance, surroundings, and crew capability. If a mission changes materially, stop and reassess instead of stretching an earlier approval.

Apply the lesson

The job site changes after approval

Situation: A mapping flight is approved for a specific grid and 100-foot altitude. The customer asks the pilot to add a nearby roof survey, and a gust front is approaching.

Reason it through: The RPIC should compare the new footprint with the authorization's boundaries and conditions, assess whether the changed mission still meets visibility, cloud, aircraft, and people rules, and evaluate the worsening weather. Customer urgency is not authority. If the roof lies outside the approval or the safety margin is inadequate, decline that segment, wait, or obtain the necessary approval and safer conditions before proceeding.

Common mistakes to avoid

  • Treating the customer or visual observer as the person who carries RPIC responsibility.
  • Thinking a LAANC approval is a Part 107 waiver or covers a different area automatically.
  • Treating every maximum as a target instead of maintaining a safety margin.

Self-check

1. Who remains accountable when an autopilot flies the route?

The designated remote pilot in command remains accountable and must monitor the operation.

2. What does airspace authorization approve?

A defined operation in controlled airspace under stated location, altitude, time, and other conditions; it does not waive unrelated rules.

Official references

Use the current regulation or FAA/PSI publication when a study summary and official material differ. PSI's current content allocation supersedes the older percentages printed in the ACS appendix.

Reviewed 2026-10-15. This lesson is educational and is not legal advice, FAA approval, or a substitute for current regulations, aircraft instructions, or required training.

Take the practice test